Lrd W Division ST over West Branch Fond Du Lac
GoodFond du Lac County, Wisconsin · .4M South WI-23 · Structure no. B20024200000000
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected May 2024
- Type
- Slab
- Concrete Continuous
- Length
- 83 ft
- 2 main spans
- Daily traffic
- 3,400
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Lrd W Division ST over West Branch Fond Du Lac is a concrete continuous slab carrying Lrd W Division ST over West Branch Fond Du Lac in Fond du Lac County, Wisconsin. It was built in 2024, so it is 1 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,400 vehicles a day, roughly 3% of them trucks, projected to reach 4,100 by 2043. The structure is 83 ft (25.2 m) long and 51 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd W Division ST over West Branch Fond Du Lac built?
It was built in 2024, making it 1 years old in 2025.
What condition is Lrd W Division ST over West Branch Fond Du Lac in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Lrd W Division ST over West Branch Fond Du Lac carry?
About 3,400 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Lrd W Division ST over West Branch Fond Du Lac?
The structure is 83 ft (25.2 m) long with a longest span of 40 ft (12.2 m) and a deck 51 ft wide.
Who owns Lrd W Division ST over West Branch Fond Du Lac?
It is owned by the City or Municipal Highway Agency.