US Bridges

Cth C over W Br Fond Du Lac River

Good

Fond du Lac County, Wisconsin · 0.9M N JCT Sth 23 · Structure no. B20014300000000

Built
2001
24 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
68 ft
1 main span
Daily traffic
1,100
2021 count
Owner
County
County Highway Agency

About this bridge

Cth C over W Br Fond Du Lac River is a prestressed concrete stringer/multi-beam or girder carrying Cth C over W Br Fond Du Lac River in Fond du Lac County, Wisconsin. It was built in 2001, so it is 24 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,100 vehicles a day, projected to reach 1,320 by 2041. The structure is 68 ft (20.7 m) long and 41 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCth C
CrossesW Br Fond Du Lac River
Location0.9M N JCT Sth 23
RouteCounty Highway 0C
Coordinates43.82, -88.6243
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70.2 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length68 ft (20.7 m)
Longest span65 ft (19.8 m)
Deck width41 ft (12.5 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,100 (2021)
Projected traffic1,320 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cth C over W Br Fond Du Lac River built?

It was built in 2001, making it 24 years old in 2025.

What condition is Cth C over W Br Fond Du Lac River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Cth C over W Br Fond Du Lac River carry?

About 1,100 vehicles per day (2021 count).

How long is Cth C over W Br Fond Du Lac River?

The structure is 68 ft (20.7 m) long with a longest span of 65 ft (19.8 m) and a deck 41 ft wide.

Who owns Cth C over W Br Fond Du Lac River?

It is owned by the County Highway Agency.