Lrd New Prospect L over E Br Milwaukee River
GoodFond du Lac County, Wisconsin · 0.3M N JCT Cth Ss · Structure no. B20013000000000
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected October 2024
- Type
- Slab
- Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 25
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd New Prospect L over E Br Milwaukee River is a concrete slab carrying Lrd New Prospect L over E Br Milwaukee River in Fond du Lac County, Wisconsin. It was built in 1996, so it is 29 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25 vehicles a day, projected to reach 26 by 2043. The structure is 34 ft (10.5 m) long and 26 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd New Prospect L over E Br Milwaukee River built?
It was built in 1996, making it 29 years old in 2025.
What condition is Lrd New Prospect L over E Br Milwaukee River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Lrd New Prospect L over E Br Milwaukee River carry?
About 25 vehicles per day (2022 count).
How long is Lrd New Prospect L over E Br Milwaukee River?
The structure is 34 ft (10.5 m) long with a longest span of 32 ft (9.8 m) and a deck 26 ft wide.
Who owns Lrd New Prospect L over E Br Milwaukee River?
It is owned by the Town or Township Highway Agency.