US Bridges

Lrd NB Hastings Wa over Ush 12 EB (clairemont Av

Fair

Eau Claire County, Wisconsin · 0.8M W Xing of 53 · Structure no. B18018500000000

Built
2007
18 years old
Condition
Fair
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
235 ft
2 main spans
Daily traffic
13,750
2021 count
Owner
State
State Highway Agency

About this bridge

Lrd NB Hastings Wa over Ush 12 EB (clairemont Av is a prestressed concrete continuous stringer/multi-beam or girder carrying Lrd NB Hastings Wa over Ush 12 EB (clairemont Av in Eau Claire County, Wisconsin. It was built in 2007, so it is 18 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 13,750 vehicles a day, projected to reach 16,500 by 2041. The structure is 235 ft (71.5 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLrd NB Hastings Wa
CrossesUsh 12 EB (clairemont Av
Location0.8M W Xing of 53
RouteCity Street 0
Coordinates44.7946, -91.46083
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79.1 US tons
Inventory rating41.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length235 ft (71.5 m)
Longest span120 ft (36.6 m)
Deck width36 ft (11.1 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,750 (2021)
Projected traffic16,500 by 2041
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.8 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Lrd NB Hastings Wa over Ush 12 EB (clairemont Av built?

It was built in 2007, making it 18 years old in 2025.

What condition is Lrd NB Hastings Wa over Ush 12 EB (clairemont Av in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does Lrd NB Hastings Wa over Ush 12 EB (clairemont Av carry?

About 13,750 vehicles per day (2021 count).

How long is Lrd NB Hastings Wa over Ush 12 EB (clairemont Av?

The structure is 235 ft (71.5 m) long with a longest span of 120 ft (36.6 m) and a deck 36 ft wide.

Who owns Lrd NB Hastings Wa over Ush 12 EB (clairemont Av?

It is owned by the State Highway Agency.