Sth 93 NB over IH 94
FairEau Claire County, Wisconsin · 1.7M N JCT Cth II · Structure no. B18011900000000
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 207 ft
- 4 main spans
- Daily traffic
- 10,400
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 93 NB over IH 94 is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 93 NB over IH 94 in Eau Claire County, Wisconsin. It was built in 1989, so it is 36 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,400 vehicles a day, roughly 7% of them trucks, projected to reach 11,600 by 2042. The structure is 207 ft (63 m) long and 49 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 93 NB over IH 94 built?
It was built in 1989, making it 36 years old in 2025.
What condition is Sth 93 NB over IH 94 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Sth 93 NB over IH 94 carry?
About 10,400 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is Sth 93 NB over IH 94?
The structure is 207 ft (63 m) long with a longest span of 68 ft (20.7 m) and a deck 49 ft wide.
Who owns Sth 93 NB over IH 94?
It is owned by the State Highway Agency.