Ush B12-MADISON ST over Chippewa River 10
FairEau Claire County, Wisconsin · 3.6M E JCT Ush 12 · Structure no. B18009100000000
- Built
- 1924
- 101 years old, rebuilt 1977
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 629 ft
- 5 main spans
- Daily traffic
- 16,000
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Ush B12-MADISON ST over Chippewa River 10 is a steel continuous stringer/multi-beam or girder carrying Ush B12-MADISON ST over Chippewa River 10 in Eau Claire County, Wisconsin. It was built in 1924 and reconstructed in 1977, so it is 101 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,000 vehicles a day, projected to reach 27,077 by 2043. The structure is 629 ft (191.6 m) long and 66 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ush B12-MADISON ST over Chippewa River 10 built?
It was built in 1924, making it 101 years old in 2025. It was reconstructed in 1977.
What condition is Ush B12-MADISON ST over Chippewa River 10 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Ush B12-MADISON ST over Chippewa River 10 carry?
About 16,000 vehicles per day (2024 count).
How long is Ush B12-MADISON ST over Chippewa River 10?
The structure is 629 ft (191.6 m) long with a longest span of 141 ft (43 m) and a deck 66 ft wide.
Who owns Ush B12-MADISON ST over Chippewa River 10?
It is owned by the City or Municipal Highway Agency.