Lrd Hastings Way N over Eau Claire River
GoodEau Claire County, Wisconsin · 1.7M N JCT Ush 12 to E · Structure no. B18007700000000
- Built
- 1970
- 55 years old, rebuilt 2003
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 843 ft
- 6 main spans
- Daily traffic
- 19,210
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Lrd Hastings Way N over Eau Claire River is a steel continuous stringer/multi-beam or girder carrying Lrd Hastings Way N over Eau Claire River in Eau Claire County, Wisconsin. It was built in 1970 and reconstructed in 2003, so it is 55 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 19,210 vehicles a day, roughly 8% of them trucks, projected to reach 52,869 by 2043. The structure is 843 ft (257 m) long and 50 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Hastings Way N over Eau Claire River built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2003.
What condition is Lrd Hastings Way N over Eau Claire River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Lrd Hastings Way N over Eau Claire River carry?
About 19,210 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is Lrd Hastings Way N over Eau Claire River?
The structure is 843 ft (257 m) long with a longest span of 157 ft (47.9 m) and a deck 50 ft wide.
Who owns Lrd Hastings Way N over Eau Claire River?
It is owned by the City or Municipal Highway Agency.