US Bridges

Lrd Apple Road over Silver Creek

Good

Dodge County, Wisconsin · 0.1 MI West of Junction W · Structure no. B14022300000000

Built
2022
3 years old
Condition
Good
inspected May 2024
Type
Slab
Concrete
Length
43 ft
1 main span
Daily traffic
100
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Apple Road over Silver Creek is a concrete slab carrying Lrd Apple Road over Silver Creek in Dodge County, Wisconsin. It was built in 2022, so it is 3 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 4% of them trucks, projected to reach 100 by 2042. The structure is 43 ft (13 m) long and 27 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesLrd Apple Road
CrossesSilver Creek
Location0.1 MI West of Junction W
RouteCity Street 0
Coordinates43.27301, -88.69414
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55 US tons
Inventory rating42.5 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length43 ft (13 m)
Longest span40 ft (12.2 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2022)
Projected traffic100 by 2042
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Apple Road over Silver Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is Lrd Apple Road over Silver Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Lrd Apple Road over Silver Creek carry?

About 100 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is Lrd Apple Road over Silver Creek?

The structure is 43 ft (13 m) long with a longest span of 40 ft (12.2 m) and a deck 27 ft wide.

Who owns Lrd Apple Road over Silver Creek?

It is owned by the Town or Township Highway Agency.