US Bridges

Sth 67-SCHUYLER ST over Rubicon River

Fair

Dodge County, Wisconsin · 3.0M N JCT Cth Mm · Structure no. B14007600000000

Built
1979
46 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
118 ft
1 main span
Daily traffic
3,800
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 67-SCHUYLER ST over Rubicon River is a steel stringer/multi-beam or girder carrying Sth 67-SCHUYLER ST over Rubicon River in Dodge County, Wisconsin. It was built in 1979, so it is 46 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,800 vehicles a day, roughly 10% of them trucks, projected to reach 1,040 by 2043. The structure is 118 ft (36.1 m) long and 49 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesSth 67-SCHUYLER ST
CrossesRubicon River
Location3.0M N JCT Cth Mm
RouteState Highway 67
Coordinates43.31128, -88.51833
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86.4 US tons
Inventory rating48.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length118 ft (36.1 m)
Longest span116 ft (35.4 m)
Deck width49 ft (14.8 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,800 (2022)
Projected traffic1,040 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sth 67-SCHUYLER ST over Rubicon River built?

It was built in 1979, making it 46 years old in 2025.

What condition is Sth 67-SCHUYLER ST over Rubicon River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Sth 67-SCHUYLER ST over Rubicon River carry?

About 3,800 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is Sth 67-SCHUYLER ST over Rubicon River?

The structure is 118 ft (36.1 m) long with a longest span of 116 ft (35.4 m) and a deck 49 ft wide.

Who owns Sth 67-SCHUYLER ST over Rubicon River?

It is owned by the State Highway Agency.