US Bridges

Cth G over Hustad Valley Creek

Good

Dane County, Wisconsin · 0.75M N of Dane/Green Cou · Structure no. B13093600000000

Built
2024
1 years old
Condition
Good
inspected September 2024
Type
Culvert
Aluminum, Wrought Iron, or Cast Iron
Length
20 ft
1 main span
Daily traffic
220
2022 count
Owner
County
County Highway Agency

About this bridge

Cth G over Hustad Valley Creek is a aluminum, wrought iron, or cast iron culvert carrying Cth G over Hustad Valley Creek in Dane County, Wisconsin. It was built in 2024, so it is 1 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 220 vehicles a day, projected to reach 264 by 2043. The structure is 20 ft (6.2 m) long and 56 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCth G
CrossesHustad Valley Creek
Location0.75M N of Dane/Green Cou
RouteCounty Highway 0G
Coordinates42.86127, -89.69659
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating81.8 US tons
Inventory rating63.2 US tons

Structure

Structure typeCulvert
MaterialAluminum, Wrought Iron, or Cast Iron
DeckNot applicable
Main spans1
Design loadHL 93
Structure length20 ft (6.2 m)
Longest span20 ft (6.2 m)
Deck width56 ft (17.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic220 (2022)
Projected traffic264 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$152,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Cth G over Hustad Valley Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is Cth G over Hustad Valley Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Cth G over Hustad Valley Creek carry?

About 220 vehicles per day (2022 count).

How long is Cth G over Hustad Valley Creek?

The structure is 20 ft (6.2 m) long with a longest span of 20 ft (6.2 m) and a deck 56 ft wide.

Who owns Cth G over Hustad Valley Creek?

It is owned by the County Highway Agency.