Lrd Williamsburg W over Ush 18/151 (verona Road)
GoodDane County, Wisconsin · 0.3 MI E JCT Whitney Way · Structure no. B13083300000000
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 208 ft
- 2 main spans
- Daily traffic
- 9,700
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Lrd Williamsburg W over Ush 18/151 (verona Road) is a prestressed concrete continuous stringer/multi-beam or girder carrying Lrd Williamsburg W over Ush 18/151 (verona Road) in Dane County, Wisconsin. It was built in 2019, so it is 6 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,700 vehicles a day, projected to reach 11,700 by 2040. The structure is 208 ft (63.3 m) long and 84 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Williamsburg W over Ush 18/151 (verona Road) built?
It was built in 2019, making it 6 years old in 2025.
What condition is Lrd Williamsburg W over Ush 18/151 (verona Road) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Lrd Williamsburg W over Ush 18/151 (verona Road) carry?
About 9,700 vehicles per day (2022 count).
How long is Lrd Williamsburg W over Ush 18/151 (verona Road)?
The structure is 208 ft (63.3 m) long with a longest span of 109 ft (33.2 m) and a deck 84 ft wide.
Who owns Lrd Williamsburg W over Ush 18/151 (verona Road)?
It is owned by the State Highway Agency.