US Bridges

IH I-39 NB / I-90 over Lrd Femrite Drive

Good

Dane County, Wisconsin · T. of Blooming Grove · Structure no. B13073200000000

Built
2021
4 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
149 ft
3 main spans
Daily traffic
48,700
2022 count
Owner
State
State Highway Agency

About this bridge

IH I-39 NB / I-90 over Lrd Femrite Drive is a prestressed concrete continuous stringer/multi-beam or girder carrying IH I-39 NB / I-90 over Lrd Femrite Drive in Dane County, Wisconsin. It was built in 2021, so it is 4 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 48,700 vehicles a day, projected to reach 58,440 by 2042. The structure is 149 ft (45.3 m) long and 63 ft wide.

CarriesIH I-39 NB / I-90
CrossesLrd Femrite Drive
LocationT. of Blooming Grove
RouteInterstate 39
Coordinates43.05187, -89.27713
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.6 US tons
Inventory rating49.6 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length149 ft (45.3 m)
Longest span60 ft (18.3 m)
Deck width63 ft (19.1 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic48,700 (2022)
Projected traffic58,440 by 2042
Trucks0%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH I-39 NB / I-90 over Lrd Femrite Drive built?

It was built in 2021, making it 4 years old in 2025.

What condition is IH I-39 NB / I-90 over Lrd Femrite Drive in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does IH I-39 NB / I-90 over Lrd Femrite Drive carry?

About 48,700 vehicles per day (2022 count).

How long is IH I-39 NB / I-90 over Lrd Femrite Drive?

The structure is 149 ft (45.3 m) long with a longest span of 60 ft (18.3 m) and a deck 63 ft wide.

Who owns IH I-39 NB / I-90 over Lrd Femrite Drive?

It is owned by the State Highway Agency.