US Bridges

Lrd Edgewood Ave over Bike Path

Good

Dane County, Wisconsin · At Bike Path · Structure no. B13057800000000

Built
2006
19 years old
Condition
Good
inspected September 2024
Type
Arch - Deck
Concrete
Length
65 ft
1 main span
Daily traffic
1,700
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd Edgewood Ave over Bike Path is a concrete arch - deck carrying Lrd Edgewood Ave over Bike Path in Dane County, Wisconsin. It was built in 2006, so it is 19 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,700 vehicles a day, projected to reach 2,009 by 2043. The structure is 65 ft (19.7 m) long and 48 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesLrd Edgewood Ave
CrossesBike Path
LocationAt Bike Path
RouteCity Street 0
Coordinates43.06467, -89.42369
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.8 US tons
Inventory rating35.7 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length65 ft (19.7 m)
Longest span60 ft (18.3 m)
Deck width48 ft (14.6 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,700 (2022)
Projected traffic2,009 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Lrd Edgewood Ave over Bike Path built?

It was built in 2006, making it 19 years old in 2025.

What condition is Lrd Edgewood Ave over Bike Path in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Lrd Edgewood Ave over Bike Path carry?

About 1,700 vehicles per day (2022 count).

How long is Lrd Edgewood Ave over Bike Path?

The structure is 65 ft (19.7 m) long with a longest span of 60 ft (18.3 m) and a deck 48 ft wide.

Who owns Lrd Edgewood Ave over Bike Path?

It is owned by the City or Municipal Highway Agency.