Sth 30 EB over Ush 51-STOUGHTON RD
GoodDane County, Wisconsin · 1.2M E JCT Ush 151 · Structure no. B13032300000000
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 220 ft
- 2 main spans
- Daily traffic
- 8,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 30 EB over Ush 51-STOUGHTON RD is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 30 EB over Ush 51-STOUGHTON RD in Dane County, Wisconsin. It was built in 1996, so it is 29 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,500 vehicles a day, roughly 3% of them trucks, projected to reach 52,450 by 2042. The structure is 220 ft (67 m) long and 58 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 30 EB over Ush 51-STOUGHTON RD built?
It was built in 1996, making it 29 years old in 2025.
What condition is Sth 30 EB over Ush 51-STOUGHTON RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Sth 30 EB over Ush 51-STOUGHTON RD carry?
About 8,500 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Sth 30 EB over Ush 51-STOUGHTON RD?
The structure is 220 ft (67 m) long with a longest span of 107 ft (32.6 m) and a deck 58 ft wide.
Who owns Sth 30 EB over Ush 51-STOUGHTON RD?
It is owned by the State Highway Agency.