US Bridges

IH 39 NB/90 WB over IH Ramp IH 94 WB to IH 9

Good

Dane County, Wisconsin · 4.2M W JCT Ush 12 to E · Structure no. B13030800000000

Built
1997
28 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
76 ft
1 main span
Daily traffic
48,700
2022 count
Owner
State
State Highway Agency

About this bridge

IH 39 NB/90 WB over IH Ramp IH 94 WB to IH 9 is a prestressed concrete stringer/multi-beam or girder carrying IH 39 NB/90 WB over IH Ramp IH 94 WB to IH 9 in Dane County, Wisconsin. It was built in 1997, so it is 28 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 48,700 vehicles a day, roughly 11% of them trucks, projected to reach 58,440 by 2042. The structure is 76 ft (23.1 m) long and 73 ft wide.

CarriesIH 39 NB/90 WB
CrossesIH Ramp IH 94 WB to IH 9
Location4.2M W JCT Ush 12 to E
RouteInterstate 90
Coordinates43.10382, -89.28217
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.4 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length76 ft (23.1 m)
Longest span72 ft (21.9 m)
Deck width73 ft (22.1 m)
Roadway width70 ft (21.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic48,700 (2022)
Projected traffic58,440 by 2042
Trucks11%
Lanes on structure4
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 39 NB/90 WB over IH Ramp IH 94 WB to IH 9 built?

It was built in 1997, making it 28 years old in 2025.

What condition is IH 39 NB/90 WB over IH Ramp IH 94 WB to IH 9 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does IH 39 NB/90 WB over IH Ramp IH 94 WB to IH 9 carry?

About 48,700 vehicles per day (2022 count), of which roughly 11% are trucks.

How long is IH 39 NB/90 WB over IH Ramp IH 94 WB to IH 9?

The structure is 76 ft (23.1 m) long with a longest span of 72 ft (21.9 m) and a deck 73 ft wide.

Who owns IH 39 NB/90 WB over IH Ramp IH 94 WB to IH 9?

It is owned by the State Highway Agency.