Ush 18 EB/151 NB over Lrd Sand Rock RD
FairDane County, Wisconsin · 0.8M E JCT Sth 78 · Structure no. B13029900000000
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 211 ft
- 3 main spans
- Daily traffic
- 9,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Ush 18 EB/151 NB over Lrd Sand Rock RD is a prestressed concrete continuous stringer/multi-beam or girder carrying Ush 18 EB/151 NB over Lrd Sand Rock RD in Dane County, Wisconsin. It was built in 1988, so it is 37 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,000 vehicles a day, roughly 8% of them trucks, projected to reach 10,800 by 2042. The structure is 211 ft (64.3 m) long and 42 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ush 18 EB/151 NB over Lrd Sand Rock RD built?
It was built in 1988, making it 37 years old in 2025.
What condition is Ush 18 EB/151 NB over Lrd Sand Rock RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Ush 18 EB/151 NB over Lrd Sand Rock RD carry?
About 9,000 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is Ush 18 EB/151 NB over Lrd Sand Rock RD?
The structure is 211 ft (64.3 m) long with a longest span of 77 ft (23.6 m) and a deck 42 ft wide.
Who owns Ush 18 EB/151 NB over Lrd Sand Rock RD?
It is owned by the State Highway Agency.