Cth a over Union Pacific RR
PoorClosed to trafficColumbia County, Wisconsin · 1.0M W JCT Sth 73 · Structure no. P11003300000000
- Built
- 1910
- 115 years old
- Condition
- Poor
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 112 ft
- 8 main spans
- Daily traffic
- 197
- 2022 count
- Owner
- Railroad
- Railroad
About this bridge
Cth a over Union Pacific RR is a wood or timber stringer/multi-beam or girder carrying Cth a over Union Pacific RR in Columbia County, Wisconsin. It was built in 1910, so it is 115 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 2 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.
It carries about 197 vehicles a day, projected to reach 216 by 2043. The structure is 112 ft (34.1 m) long and 26 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 2 Critical | Advanced deterioration of primary structural elements. Bridge may be closed until corrective action is taken. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cth a over Union Pacific RR built?
It was built in 1910, making it 115 years old in 2025.
What condition is Cth a over Union Pacific RR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2024.
How much traffic does Cth a over Union Pacific RR carry?
About 197 vehicles per day (2022 count).
How long is Cth a over Union Pacific RR?
The structure is 112 ft (34.1 m) long with a longest span of 24 ft (7.2 m) and a deck 26 ft wide.
Who owns Cth a over Union Pacific RR?
It is owned by the Railroad.