Sth 16-STH 60-MANN over Crawfish River
FairColumbia County, Wisconsin · 0.3M E JCT Sth 73 to S · Structure no. B11013500000000
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected August 2024
- Type
- Slab
- Concrete Continuous
- Length
- 105 ft
- 2 main spans
- Daily traffic
- 3,800
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Sth 16-STH 60-MANN over Crawfish River is a concrete continuous slab carrying Sth 16-STH 60-MANN over Crawfish River in Columbia County, Wisconsin. It was built in 2005, so it is 20 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,800 vehicles a day, roughly 11% of them trucks, projected to reach 4,560 by 2041. The structure is 105 ft (31.9 m) long and 58 ft wide. If it were closed, the detour would be 7.5 mi (12 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 16-STH 60-MANN over Crawfish River built?
It was built in 2005, making it 20 years old in 2025.
What condition is Sth 16-STH 60-MANN over Crawfish River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Sth 16-STH 60-MANN over Crawfish River carry?
About 3,800 vehicles per day (2021 count), of which roughly 11% are trucks.
How long is Sth 16-STH 60-MANN over Crawfish River?
The structure is 105 ft (31.9 m) long with a longest span of 51 ft (15.5 m) and a deck 58 ft wide.
Who owns Sth 16-STH 60-MANN over Crawfish River?
It is owned by the City or Municipal Highway Agency.