US Bridges

IH 39 SB over Baraboo River

Fair

Columbia County, Wisconsin · 1.9M S JCT Sth 33 to E · Structure no. B11005300000000

Built
1962
63 years old, rebuilt 1999
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
174 ft
3 main spans
Daily traffic
10,000
2021 count
Owner
State
State Highway Agency

About this bridge

IH 39 SB over Baraboo River is a prestressed concrete stringer/multi-beam or girder carrying IH 39 SB over Baraboo River in Columbia County, Wisconsin. It was built in 1962 and reconstructed in 1999, so it is 63 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,000 vehicles a day, roughly 10% of them trucks, projected to reach 12,000 by 2041. The structure is 174 ft (52.9 m) long and 42 ft wide.

CarriesIH 39 SB
CrossesBaraboo River
Location1.9M S JCT Sth 33 to E
RouteInterstate 39
Coordinates43.50169, -89.48439
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.9 US tons
Inventory rating57.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length174 ft (52.9 m)
Longest span57 ft (17.3 m)
Deck width42 ft (12.9 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,000 (2021)
Projected traffic12,000 by 2041
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 39 SB over Baraboo River built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1999.

What condition is IH 39 SB over Baraboo River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does IH 39 SB over Baraboo River carry?

About 10,000 vehicles per day (2021 count), of which roughly 10% are trucks.

How long is IH 39 SB over Baraboo River?

The structure is 174 ft (52.9 m) long with a longest span of 57 ft (17.3 m) and a deck 42 ft wide.

Who owns IH 39 SB over Baraboo River?

It is owned by the State Highway Agency.