Lrd Meridian Ave over E. Fk. Popple River
GoodClark County, Wisconsin · 0.4M S JCT Cth N · Structure no. B10023100000000
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected September 2024
- Type
- Slab
- Concrete Continuous
- Length
- 82 ft
- 2 main spans
- Daily traffic
- 120
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Meridian Ave over E. Fk. Popple River is a concrete continuous slab carrying Lrd Meridian Ave over E. Fk. Popple River in Clark County, Wisconsin. It was built in 2019, so it is 6 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 120 vehicles a day, roughly 15% of them trucks, projected to reach 180 by 2043. The structure is 82 ft (25.1 m) long and 27 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Meridian Ave over E. Fk. Popple River built?
It was built in 2019, making it 6 years old in 2025.
What condition is Lrd Meridian Ave over E. Fk. Popple River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Lrd Meridian Ave over E. Fk. Popple River carry?
About 120 vehicles per day (2022 count), of which roughly 15% are trucks.
How long is Lrd Meridian Ave over E. Fk. Popple River?
The structure is 82 ft (25.1 m) long with a longest span of 40 ft (12.2 m) and a deck 27 ft wide.
Who owns Lrd Meridian Ave over E. Fk. Popple River?
It is owned by the Town or Township Highway Agency.