Lrd 20th Avenue over S Fk Paint Creek
FairPosted for loadChippewa County, Wisconsin · 0.8 M E Cth K · Structure no. P09017200000000
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected October 2024
- Type
- Slab
- Wood or Timber
- Length
- 23 ft
- 1 main span
- Daily traffic
- 465
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd 20th Avenue over S Fk Paint Creek is a wood or timber slab carrying Lrd 20th Avenue over S Fk Paint Creek in Chippewa County, Wisconsin. It was built in 1968, so it is 57 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 465 vehicles a day, projected to reach 489 by 2043. The structure is 23 ft (7 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd 20th Avenue over S Fk Paint Creek built?
It was built in 1968, making it 57 years old in 2025.
What condition is Lrd 20th Avenue over S Fk Paint Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Lrd 20th Avenue over S Fk Paint Creek carry?
About 465 vehicles per day (2023 count).
How long is Lrd 20th Avenue over S Fk Paint Creek?
The structure is 23 ft (7 m) long with a longest span of 22 ft (6.7 m) and a deck 28 ft wide.
Who owns Lrd 20th Avenue over S Fk Paint Creek?
It is owned by the Town or Township Highway Agency.