Sth 27 over Holcombe Flowage
GoodChippewa County, Wisconsin · 1.6M N JCT Cth M to E · Structure no. B09027300000000
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 431 ft
- 3 main spans
- Daily traffic
- 4,500
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 27 over Holcombe Flowage is a prestressed concrete stringer/multi-beam or girder carrying Sth 27 over Holcombe Flowage in Chippewa County, Wisconsin. It was built in 2009, so it is 16 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,500 vehicles a day, roughly 5% of them trucks, projected to reach 5,300 by 2042. The structure is 431 ft (131.3 m) long and 47 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 27 over Holcombe Flowage built?
It was built in 2009, making it 16 years old in 2025.
What condition is Sth 27 over Holcombe Flowage in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does Sth 27 over Holcombe Flowage carry?
About 4,500 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is Sth 27 over Holcombe Flowage?
The structure is 431 ft (131.3 m) long with a longest span of 142 ft (43.4 m) and a deck 47 ft wide.
Who owns Sth 27 over Holcombe Flowage?
It is owned by the State Highway Agency.