US Bridges

Sth 29 - Off Ramp over Sth 124

Good

Chippewa County, Wisconsin · At Sth 124 · Structure no. B09024500000000

Built
2004
21 years old
Condition
Good
inspected April 2021
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
204 ft
2 main spans
Daily traffic
1,600
2021 count
Owner
State
State Highway Agency

About this bridge

Sth 29 - Off Ramp over Sth 124 is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 29 - Off Ramp over Sth 124 in Chippewa County, Wisconsin. It was built in 2004, so it is 21 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,600 vehicles a day, projected to reach 1,920 by 2041. The structure is 204 ft (62.2 m) long and 29 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSth 29 - Off Ramp
CrossesSth 124
LocationAt Sth 124
RouteState Highway 29
Coordinates44.89234, -91.41943
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionApril 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80.5 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length204 ft (62.2 m)
Longest span100 ft (30.5 m)
Deck width29 ft (8.8 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,600 (2021)
Projected traffic1,920 by 2041
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sth 29 - Off Ramp over Sth 124 built?

It was built in 2004, making it 21 years old in 2025.

What condition is Sth 29 - Off Ramp over Sth 124 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2021.

How much traffic does Sth 29 - Off Ramp over Sth 124 carry?

About 1,600 vehicles per day (2021 count).

How long is Sth 29 - Off Ramp over Sth 124?

The structure is 204 ft (62.2 m) long with a longest span of 100 ft (30.5 m) and a deck 29 ft wide.

Who owns Sth 29 - Off Ramp over Sth 124?

It is owned by the State Highway Agency.