Sth 178 NB over Chippewa River
FairChippewa County, Wisconsin · 2.0 M N Cth J · Structure no. B09023500000000
- Built
- 2000
- 25 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 879 ft
- 5 main spans
- Daily traffic
- 6,250
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 178 NB over Chippewa River is a steel continuous stringer/multi-beam or girder carrying Sth 178 NB over Chippewa River in Chippewa County, Wisconsin. It was built in 2000, so it is 25 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,250 vehicles a day, roughly 7% of them trucks, projected to reach 7,500 by 2041. The structure is 879 ft (267.8 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 178 NB over Chippewa River built?
It was built in 2000, making it 25 years old in 2025.
What condition is Sth 178 NB over Chippewa River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Sth 178 NB over Chippewa River carry?
About 6,250 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is Sth 178 NB over Chippewa River?
The structure is 879 ft (267.8 m) long with a longest span of 187 ft (57 m) and a deck 39 ft wide.
Who owns Sth 178 NB over Chippewa River?
It is owned by the State Highway Agency.