US Bridges

Lrd Main Street over Drainage Ditch

Good

Chippewa County, Wisconsin · 1.0 M N Cth Ss · Structure no. B09019900000000

Built
1999
26 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete Continuous
Length
25 ft
2 main spans
Daily traffic
5,420
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd Main Street over Drainage Ditch is a concrete continuous culvert carrying Lrd Main Street over Drainage Ditch in Chippewa County, Wisconsin. It was built in 1999, so it is 26 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,420 vehicles a day, projected to reach 5,728 by 2043. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 2.5 mi (4 km).

CarriesLrd Main Street
CrossesDrainage Ditch
Location1.0 M N Cth Ss
RouteCity Street 0
Coordinates45.10953, -91.48867
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.6 US tons
Inventory rating44.6 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length25 ft (7.6 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,420 (2023)
Projected traffic5,728 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Main Street over Drainage Ditch built?

It was built in 1999, making it 26 years old in 2025.

What condition is Lrd Main Street over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Lrd Main Street over Drainage Ditch carry?

About 5,420 vehicles per day (2023 count).

How long is Lrd Main Street over Drainage Ditch?

The structure is 25 ft (7.6 m) long with a longest span of 10 ft (3 m).

Who owns Lrd Main Street over Drainage Ditch?

It is owned by the City or Municipal Highway Agency.