Lrd Grand ST over S Br Manitowoc River
PoorCalumet County, Wisconsin · 0.2M E JCT Sth 57 · Structure no. P08070500000000
- Built
- 1927
- 98 years old
- Condition
- Poor
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 1,997
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Lrd Grand ST over S Br Manitowoc River is a concrete stringer/multi-beam or girder carrying Lrd Grand ST over S Br Manitowoc River in Calumet County, Wisconsin. It was built in 1927, so it is 98 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 1,997 vehicles a day, projected to reach 2,196 by 2043. The structure is 52 ft (15.8 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Grand ST over S Br Manitowoc River built?
It was built in 1927, making it 98 years old in 2025.
What condition is Lrd Grand ST over S Br Manitowoc River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in May 2024.
How much traffic does Lrd Grand ST over S Br Manitowoc River carry?
About 1,997 vehicles per day (2022 count).
How long is Lrd Grand ST over S Br Manitowoc River?
The structure is 52 ft (15.8 m) long with a longest span of 50 ft (15.2 m) and a deck 40 ft wide.
Who owns Lrd Grand ST over S Br Manitowoc River?
It is owned by the City or Municipal Highway Agency.