Lrd Namekagon Trai over Namekagon River
FairBurnett County, Wisconsin · 3.7M N JCT Sth 77 · Structure no. B07002800000000
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 153 ft
- 3 main spans
- Daily traffic
- 60
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Namekagon Trai over Namekagon River is a prestressed concrete continuous stringer/multi-beam or girder carrying Lrd Namekagon Trai over Namekagon River in Burnett County, Wisconsin. It was built in 1992, so it is 33 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 60 vehicles a day, projected to reach 51 by 2043. The structure is 153 ft (46.6 m) long and 26 ft wide. If it were closed, the detour would be 23 mi (37 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Namekagon Trai over Namekagon River built?
It was built in 1992, making it 33 years old in 2025.
What condition is Lrd Namekagon Trai over Namekagon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Lrd Namekagon Trai over Namekagon River carry?
About 60 vehicles per day (2024 count).
How long is Lrd Namekagon Trai over Namekagon River?
The structure is 153 ft (46.6 m) long with a longest span of 51 ft (15.5 m) and a deck 26 ft wide.
Who owns Lrd Namekagon Trai over Namekagon River?
It is owned by the Town or Township Highway Agency.