US Bridges

Lrd Sand Road over Elk Creek

FairPosted for load

Buffalo County, Wisconsin · 0.3M N JCT Sth 88 · Structure no. P06014100000000

Built
1979
46 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
49 ft
2 main spans
Daily traffic
94
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Sand Road over Elk Creek is a steel stringer/multi-beam or girder carrying Lrd Sand Road over Elk Creek in Buffalo County, Wisconsin. It was built in 1979, so it is 46 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 94 vehicles a day, projected to reach 103 by 2043. The structure is 49 ft (14.8 m) long and 25 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesLrd Sand Road
CrossesElk Creek
Location0.3M N JCT Sth 88
RouteCity Street 0
Coordinates44.46944, -91.7
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating28.5 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans2
Design loadHS 20
Structure length49 ft (14.8 m)
Longest span24 ft (7.2 m)
Deck width25 ft (7.6 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic94 (2022)
Projected traffic103 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Sand Road over Elk Creek built?

It was built in 1979, making it 46 years old in 2025.

What condition is Lrd Sand Road over Elk Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Lrd Sand Road over Elk Creek carry?

About 94 vehicles per day (2022 count).

How long is Lrd Sand Road over Elk Creek?

The structure is 49 ft (14.8 m) long with a longest span of 24 ft (7.2 m) and a deck 25 ft wide.

Who owns Lrd Sand Road over Elk Creek?

It is owned by the Town or Township Highway Agency.