US Bridges

Cth Oo over Rose Valley Creek

Good

Buffalo County, Wisconsin · 0.5 MI West of Junction W · Structure no. B06019700000000

Built
2022
3 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete Continuous
Length
26 ft
2 main spans
Daily traffic
700
2022 count
Owner
County
County Highway Agency

About this bridge

Cth Oo over Rose Valley Creek is a concrete continuous culvert carrying Cth Oo over Rose Valley Creek in Buffalo County, Wisconsin. It was built in 2022, so it is 3 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 700 vehicles a day, roughly 5% of them trucks, projected to reach 950 by 2042. The structure is 26 ft (8 m) long and 30 ft wide. If it were closed, the detour would be 10.6 mi (17 km).

CarriesCth Oo
CrossesRose Valley Creek
Location0.5 MI West of Junction W
RouteCounty Highway 0
Coordinates44.21972, -91.82806
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length26 ft (8 m)
Longest span12 ft (3.7 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic700 (2022)
Projected traffic950 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed10.6 mi (17 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cth Oo over Rose Valley Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is Cth Oo over Rose Valley Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Cth Oo over Rose Valley Creek carry?

About 700 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Cth Oo over Rose Valley Creek?

The structure is 26 ft (8 m) long with a longest span of 12 ft (3.7 m) and a deck 30 ft wide.

Who owns Cth Oo over Rose Valley Creek?

It is owned by the County Highway Agency.