US Bridges

Lrd Rotering RD over Fimian Creek

Good

Buffalo County, Wisconsin · 0.2M S JCT Cth S · Structure no. B06018000000000

Built
2008
17 years old
Condition
Good
inspected November 2024
Type
Slab
Concrete
Length
36 ft
1 main span
Daily traffic
20
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Rotering RD over Fimian Creek is a concrete slab carrying Lrd Rotering RD over Fimian Creek in Buffalo County, Wisconsin. It was built in 2008, so it is 17 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20 vehicles a day, roughly 10% of them trucks, projected to reach 22 by 2043. The structure is 36 ft (11.1 m) long and 27 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesLrd Rotering RD
CrossesFimian Creek
Location0.2M S JCT Cth S
RouteCity Street 0
Coordinates44.34417, -91.87778
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.8 US tons
Inventory rating48.2 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length36 ft (11.1 m)
Longest span34 ft (10.4 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2022)
Projected traffic22 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Rotering RD over Fimian Creek built?

It was built in 2008, making it 17 years old in 2025.

What condition is Lrd Rotering RD over Fimian Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Lrd Rotering RD over Fimian Creek carry?

About 20 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is Lrd Rotering RD over Fimian Creek?

The structure is 36 ft (11.1 m) long with a longest span of 34 ft (10.4 m) and a deck 27 ft wide.

Who owns Lrd Rotering RD over Fimian Creek?

It is owned by the Town or Township Highway Agency.