US Bridges

Lrd Cth Z over Dry Run

Good

Buffalo County, Wisconsin · 1.9M E JCT Sth 88 · Structure no. B06016300000000

Built
2004
21 years old
Condition
Good
inspected October 2024
Type
Culvert
Steel
Length
21 ft
3 main spans
Daily traffic
349
2022 count
Owner
County
County Highway Agency

About this bridge

Lrd Cth Z over Dry Run is a steel culvert carrying Lrd Cth Z over Dry Run in Buffalo County, Wisconsin. It was built in 2004, so it is 21 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 349 vehicles a day, roughly 5% of them trucks, projected to reach 383 by 2043. The structure is 21 ft (6.5 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesLrd Cth Z
CrossesDry Run
Location1.9M E JCT Sth 88
RouteCity Street 0
Coordinates44.47694, -91.64611
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckSteel plate
Main spans3
Design loadHS 20
Structure length21 ft (6.5 m)
Longest span5 ft (1.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic349 (2022)
Projected traffic383 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Cth Z over Dry Run built?

It was built in 2004, making it 21 years old in 2025.

What condition is Lrd Cth Z over Dry Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Lrd Cth Z over Dry Run carry?

About 349 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Lrd Cth Z over Dry Run?

The structure is 21 ft (6.5 m) long with a longest span of 5 ft (1.5 m).

Who owns Lrd Cth Z over Dry Run?

It is owned by the County Highway Agency.