US Bridges

IH 41 NB over Cormier Road

Good

Brown County, Wisconsin · At Cormier Road · Structure no. B05062900000000

Built
2015
10 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
103 ft
1 main span
Daily traffic
42,400
2023 count
Owner
State
State Highway Agency

About this bridge

IH 41 NB over Cormier Road is a prestressed concrete stringer/multi-beam or girder carrying IH 41 NB over Cormier Road in Brown County, Wisconsin. It was built in 2015, so it is 10 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 42,400 vehicles a day, projected to reach 59,500 by 2042. The structure is 103 ft (31.5 m) long and 93 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesIH 41 NB
CrossesCormier Road
LocationAt Cormier Road
RouteInterstate 41
Coordinates44.49506, -88.08119
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.4 US tons
Inventory rating50.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length103 ft (31.5 m)
Longest span99 ft (30.2 m)
Deck width93 ft (28.3 m)
Roadway width89 ft (27 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic42,400 (2023)
Projected traffic59,500 by 2042
Trucks0%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 41 NB over Cormier Road built?

It was built in 2015, making it 10 years old in 2025.

What condition is IH 41 NB over Cormier Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does IH 41 NB over Cormier Road carry?

About 42,400 vehicles per day (2023 count).

How long is IH 41 NB over Cormier Road?

The structure is 103 ft (31.5 m) long with a longest span of 99 ft (30.2 m) and a deck 93 ft wide.

Who owns IH 41 NB over Cormier Road?

It is owned by the State Highway Agency.