US Bridges

Lrd Taylor Street over Beaver Dam Creek

Good

Brown County, Wisconsin · .2 Miles S of Junction Wi · Structure no. B05046900000000

Built
2022
3 years old
Condition
Good
inspected October 2024
Type
Slab
Concrete
Length
34 ft
1 main span
Daily traffic
5,735
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd Taylor Street over Beaver Dam Creek is a concrete slab carrying Lrd Taylor Street over Beaver Dam Creek in Brown County, Wisconsin. It was built in 2022, so it is 3 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,735 vehicles a day, roughly 10% of them trucks, projected to reach 6,350 by 2042. The structure is 34 ft (10.5 m) long and 58 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesLrd Taylor Street
CrossesBeaver Dam Creek
Location.2 Miles S of Junction Wi
RouteCity Street 0
Coordinates44.52108, -88.08047
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating41.1 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length34 ft (10.5 m)
Longest span32 ft (9.8 m)
Deck width58 ft (17.7 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,735 (2022)
Projected traffic6,350 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Taylor Street over Beaver Dam Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is Lrd Taylor Street over Beaver Dam Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Lrd Taylor Street over Beaver Dam Creek carry?

About 5,735 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is Lrd Taylor Street over Beaver Dam Creek?

The structure is 34 ft (10.5 m) long with a longest span of 32 ft (9.8 m) and a deck 58 ft wide.

Who owns Lrd Taylor Street over Beaver Dam Creek?

It is owned by the City or Municipal Highway Agency.