Cth Zz Eiler Roa over East River
GoodBrown County, Wisconsin · 0.1M W JCT Sth 57 · Structure no. B05042200000000
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 81 ft
- 1 main span
- Daily traffic
- 2,150
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Cth Zz Eiler Roa over East River is a prestressed concrete stringer/multi-beam or girder carrying Cth Zz Eiler Roa over East River in Brown County, Wisconsin. It was built in 2018, so it is 7 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,150 vehicles a day, roughly 6% of them trucks, projected to reach 2,900 by 2043. The structure is 81 ft (24.6 m) long and 36 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cth Zz Eiler Roa over East River built?
It was built in 2018, making it 7 years old in 2025.
What condition is Cth Zz Eiler Roa over East River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Cth Zz Eiler Roa over East River carry?
About 2,150 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is Cth Zz Eiler Roa over East River?
The structure is 81 ft (24.6 m) long with a longest span of 77 ft (23.5 m) and a deck 36 ft wide.
Who owns Cth Zz Eiler Roa over East River?
It is owned by the County Highway Agency.