US Bridges

Cth Vv over Sth 29

Good

Brown County, Wisconsin · Cth Vv over Sth 29 · Structure no. B05041600000000

Built
2022
3 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
222 ft
2 main spans
Daily traffic
7,600
2021 count
Owner
State
State Highway Agency

About this bridge

Cth Vv over Sth 29 is a prestressed concrete continuous stringer/multi-beam or girder carrying Cth Vv over Sth 29 in Brown County, Wisconsin. It was built in 2022, so it is 3 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,600 vehicles a day, projected to reach 9,200 by 2041. The structure is 222 ft (67.8 m) long and 64 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCth Vv
CrossesSth 29
LocationCth Vv over Sth 29
RouteCounty Highway 0VV
Coordinates44.57673, -88.17196
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.7 US tons
Inventory rating40.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length222 ft (67.8 m)
Longest span109 ft (33.2 m)
Deck width64 ft (19.6 m)
Roadway width58 ft (17.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,600 (2021)
Projected traffic9,200 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Cth Vv over Sth 29 built?

It was built in 2022, making it 3 years old in 2025.

What condition is Cth Vv over Sth 29 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Cth Vv over Sth 29 carry?

About 7,600 vehicles per day (2021 count).

How long is Cth Vv over Sth 29?

The structure is 222 ft (67.8 m) long with a longest span of 109 ft (33.2 m) and a deck 64 ft wide.

Who owns Cth Vv over Sth 29?

It is owned by the State Highway Agency.