US Bridges

Cth G/Chicago St. over Tributary to E River Flo

Fair

Brown County, Wisconsin · 0.1M E of Cth Gv · Structure no. B05041200000000

Built
2016
9 years old
Condition
Fair
inspected November 2023
Type
Slab
Concrete
Length
26 ft
1 main span
Daily traffic
4,700
2022 count
Owner
County
County Highway Agency

About this bridge

Cth G/Chicago St. over Tributary to E River Flo is a concrete slab carrying Cth G/Chicago St. over Tributary to E River Flo in Brown County, Wisconsin. It was built in 2016, so it is 9 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,700 vehicles a day, projected to reach 5,640 by 2042. The structure is 26 ft (7.8 m) long and 43 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesCth G/Chicago St.
CrossesTributary to E River Flo
Location0.1M E of Cth Gv
RouteCounty Highway 0G
Coordinates44.43178, -88.01375
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.2 US tons
Inventory rating45 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length26 ft (7.8 m)
Longest span23 ft (7 m)
Deck width43 ft (13.1 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,700 (2022)
Projected traffic5,640 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cth G/Chicago St. over Tributary to E River Flo built?

It was built in 2016, making it 9 years old in 2025.

What condition is Cth G/Chicago St. over Tributary to E River Flo in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Cth G/Chicago St. over Tributary to E River Flo carry?

About 4,700 vehicles per day (2022 count).

How long is Cth G/Chicago St. over Tributary to E River Flo?

The structure is 26 ft (7.8 m) long with a longest span of 23 ft (7 m) and a deck 43 ft wide.

Who owns Cth G/Chicago St. over Tributary to E River Flo?

It is owned by the County Highway Agency.