US Bridges

Lrd Webster Ave over East River

Fair

Brown County, Wisconsin · 0.1M N JCT Sth 29 · Structure no. B05028500000000

Built
1990
35 years old
Condition
Fair
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
147 ft
3 main spans
Daily traffic
15,300
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd Webster Ave over East River is a prestressed concrete box beam or girders - multiple carrying Lrd Webster Ave over East River in Brown County, Wisconsin. It was built in 1990, so it is 35 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15,300 vehicles a day, projected to reach 16,830 by 2043. The structure is 147 ft (44.7 m) long and 67 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesLrd Webster Ave
CrossesEast River
Location0.1M N JCT Sth 29
RouteCity Street 0
Coordinates44.51485, -88.0018
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.8 US tons
Inventory rating32.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length147 ft (44.7 m)
Longest span47 ft (14.3 m)
Deck width67 ft (20.3 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,300 (2022)
Projected traffic16,830 by 2043
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Webster Ave over East River built?

It was built in 1990, making it 35 years old in 2025.

What condition is Lrd Webster Ave over East River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Lrd Webster Ave over East River carry?

About 15,300 vehicles per day (2022 count).

How long is Lrd Webster Ave over East River?

The structure is 147 ft (44.7 m) long with a longest span of 47 ft (14.3 m) and a deck 67 ft wide.

Who owns Lrd Webster Ave over East River?

It is owned by the City or Municipal Highway Agency.