Sth 54 EB Off Ramp over Land

Fair

Brown County, Wisconsin · 3.5M E JCT Ush 41 to S · Structure no. B05013400210000

Built
1973
52 years old
Condition
Fair
inspected September 2023
Type
Tee Beam
Concrete Continuous
Length
147 ft
3 main spans
Daily traffic
2,200
2021 count
Owner
State
State Highway Agency

About this bridge

Sth 54 EB Off Ramp over Land is a concrete continuous tee beam carrying Sth 54 EB Off Ramp over Land in Brown County, Wisconsin. It was built in 1973, so it is 52 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,200 vehicles a day, roughly 10% of them trucks, projected to reach 60,000 by 2042. The structure is 147 ft (44.8 m) long and 25 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSth 54 EB Off Ramp
CrossesLand
Location3.5M E JCT Ush 41 to S
RouteState Highway 54
Coordinates44.50668, -88.01774
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.8 US tons
Inventory rating25 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length147 ft (44.8 m)
Longest span55 ft (16.8 m)
Deck width25 ft (7.6 m)
Roadway width21 ft (6.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,200 (2021)
Projected traffic60,000 by 2042
Trucks10%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.2 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sth 54 EB Off Ramp over Land built?

It was built in 1973, making it 52 years old in 2025.

What condition is Sth 54 EB Off Ramp over Land in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Sth 54 EB Off Ramp over Land carry?

About 2,200 vehicles per day (2021 count), of which roughly 10% are trucks.

How long is Sth 54 EB Off Ramp over Land?

The structure is 147 ft (44.8 m) long with a longest span of 55 ft (16.8 m) and a deck 25 ft wide.

Who owns Sth 54 EB Off Ramp over Land?

It is owned by the State Highway Agency.