Cth Z (hill Road) over Plum Creek
PoorBrown County, Wisconsin · 1.0M E JCT Cth D · Structure no. B05011800000000
- Built
- 1969
- 56 years old
- Condition
- Poor
- inspected September 2024
- Type
- Culvert
- Concrete Continuous
- Length
- 32 ft
- 3 main spans
- Daily traffic
- 1,100
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Cth Z (hill Road) over Plum Creek is a concrete continuous culvert carrying Cth Z (hill Road) over Plum Creek in Brown County, Wisconsin. It was built in 1969, so it is 56 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 1,100 vehicles a day, projected to reach 1,320 by 2042. The structure is 32 ft (9.9 m) long. If it were closed, the detour would be 5.6 mi (9 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cth Z (hill Road) over Plum Creek built?
It was built in 1969, making it 56 years old in 2025.
What condition is Cth Z (hill Road) over Plum Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2024.
How much traffic does Cth Z (hill Road) over Plum Creek carry?
About 1,100 vehicles per day (2022 count).
How long is Cth Z (hill Road) over Plum Creek?
The structure is 32 ft (9.9 m) long with a longest span of 10 ft (3 m).
Who owns Cth Z (hill Road) over Plum Creek?
It is owned by the County Highway Agency.