US Bridges

Lrd 3 1/2 Ave over S Fk Hay River

Good

Barron County, Wisconsin · 0.5M W JCT Cth K · Structure no. B03014200000000

Built
1997
28 years old
Condition
Good
inspected June 2023
Type
Slab
Concrete
Length
45 ft
1 main span
Daily traffic
23
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd 3 1/2 Ave over S Fk Hay River is a concrete slab carrying Lrd 3 1/2 Ave over S Fk Hay River in Barron County, Wisconsin. It was built in 1997, so it is 28 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 23 vehicles a day, projected to reach 25 by 2042. The structure is 45 ft (13.8 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesLrd 3 1/2 Ave
CrossesS Fk Hay River
Location0.5M W JCT Cth K
RouteCity Street 0
Coordinates45.26019, -92.13667
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy0: Immediate repair necessary to put back in service
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.7 US tons
Inventory rating42.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length45 ft (13.8 m)
Longest span43 ft (13 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic23 (2022)
Projected traffic25 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$211,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd 3 1/2 Ave over S Fk Hay River built?

It was built in 1997, making it 28 years old in 2025.

What condition is Lrd 3 1/2 Ave over S Fk Hay River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Lrd 3 1/2 Ave over S Fk Hay River carry?

About 23 vehicles per day (2022 count).

How long is Lrd 3 1/2 Ave over S Fk Hay River?

The structure is 45 ft (13.8 m) long with a longest span of 43 ft (13 m) and a deck 28 ft wide.

Who owns Lrd 3 1/2 Ave over S Fk Hay River?

It is owned by the Town or Township Highway Agency.