US Bridges

Moxee Dump Road over Roza Canal

FairPosted for load

Yakima County, Washington · 00.08 E Konnowac Ps · Structure no. 082295000000000

Built
1964
61 years old
Condition
Fair
inspected January 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
37 ft
1 main span
Daily traffic
15
2023 count
Owner
County
County Highway Agency

About this bridge

Moxee Dump Road over Roza Canal is a steel stringer/multi-beam or girder carrying Moxee Dump Road over Roza Canal in Yakima County, Washington. It was built in 1964, so it is 61 years old, older than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 15 vehicles a day, roughly 5% of them trucks, projected to reach 15 by 2043. The structure is 37 ft (11.3 m) long and 20 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesMoxee Dump Road
CrossesRoza Canal
Location00.08 E Konnowac Ps
RouteCounty Highway 40520
Coordinates46.52833, -120.37167
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating25 US tons
Inventory rating19.3 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadUnknown
Structure length37 ft (11.3 m)
Longest span36 ft (11 m)
Deck width20 ft (6.2 m)
Roadway width19 ft (5.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15 (2023)
Projected traffic15 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.7 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Moxee Dump Road over Roza Canal built?

It was built in 1964, making it 61 years old in 2025.

What condition is Moxee Dump Road over Roza Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.

How much traffic does Moxee Dump Road over Roza Canal carry?

About 15 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Moxee Dump Road over Roza Canal?

The structure is 37 ft (11.3 m) long with a longest span of 36 ft (11 m) and a deck 20 ft wide.

Who owns Moxee Dump Road over Roza Canal?

It is owned by the County Highway Agency.