US Bridges

I-82 over Wine Country RD RR Ped

Fair

Yakima County, Washington · 3.8 E JCT SR 241 · Structure no. 0011095A0000000

Built
1979
46 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
356 ft
4 main spans
Daily traffic
14,593
2023 count
Owner
State
State Highway Agency

About this bridge

I-82 over Wine Country RD RR Ped is a prestressed concrete continuous stringer/multi-beam or girder carrying I-82 over Wine Country RD RR Ped in Yakima County, Washington. It was built in 1979, so it is 46 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 14,593 vehicles a day, roughly 15% of them trucks, projected to reach 17,795 by 2039. The structure is 356 ft (108.5 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-82
CrossesWine Country RD RR Ped
Location3.8 E JCT SR 241
RouteInterstate 82
Coordinates46.27056, -119.92414
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length356 ft (108.5 m)
Longest span118 ft (36 m)
Deck width40 ft (12.3 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,593 (2023)
Projected traffic17,795 by 2039
Trucks15%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$6.8 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-82 over Wine Country RD RR Ped built?

It was built in 1979, making it 46 years old in 2025.

What condition is I-82 over Wine Country RD RR Ped in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does I-82 over Wine Country RD RR Ped carry?

About 14,593 vehicles per day (2023 count), of which roughly 15% are trucks.

How long is I-82 over Wine Country RD RR Ped?

The structure is 356 ft (108.5 m) long with a longest span of 118 ft (36 m) and a deck 40 ft wide.

Who owns I-82 over Wine Country RD RR Ped?

It is owned by the State Highway Agency.