US Bridges

ERIKSEN/4490 over Cottonwood Creek

Fair

Whitman County, Washington · 0.07 MI S SR 23 · Structure no. 083878000000000

Built
1981
44 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
53 ft
1 main span
Daily traffic
40
2020 count
Owner
County
County Highway Agency

About this bridge

ERIKSEN/4490 over Cottonwood Creek is a prestressed concrete stringer/multi-beam or girder carrying ERIKSEN/4490 over Cottonwood Creek in Whitman County, Washington. It was built in 1981, so it is 44 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 40 vehicles a day, roughly 25% of them trucks, projected to reach 41 by 2039. The structure is 53 ft (16.2 m) long and 28 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesERIKSEN/4490
CrossesCottonwood Creek
Location0.07 MI S SR 23
RouteCounty Highway 44900
Coordinates47.1142, -117.66345
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating32.5 US tons
Inventory rating24.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length53 ft (16.2 m)
Longest span52 ft (15.8 m)
Deck width28 ft (8.5 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2020)
Projected traffic41 by 2039
Trucks25%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2.3 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was ERIKSEN/4490 over Cottonwood Creek built?

It was built in 1981, making it 44 years old in 2025.

What condition is ERIKSEN/4490 over Cottonwood Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does ERIKSEN/4490 over Cottonwood Creek carry?

About 40 vehicles per day (2020 count), of which roughly 25% are trucks.

How long is ERIKSEN/4490 over Cottonwood Creek?

The structure is 53 ft (16.2 m) long with a longest span of 52 ft (15.8 m) and a deck 28 ft wide.

Who owns ERIKSEN/4490 over Cottonwood Creek?

It is owned by the County Highway Agency.