GARFLD-FRMGTN/1300 over South Fork Pine Creek
FairPosted for loadWhitman County, Washington · 0.01 MI S Farmington · Structure no. 080533000000000
- Built
- 1973
- 52 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 28 ft
- 1 main span
- Daily traffic
- 228
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
GARFLD-FRMGTN/1300 over South Fork Pine Creek is a prestressed concrete stringer/multi-beam or girder carrying GARFLD-FRMGTN/1300 over South Fork Pine Creek in Whitman County, Washington. It was built in 1973, so it is 52 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 228 vehicles a day, roughly 25% of them trucks, projected to reach 228 by 2044. The structure is 28 ft (8.5 m) long and 28 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was GARFLD-FRMGTN/1300 over South Fork Pine Creek built?
It was built in 1973, making it 52 years old in 2025.
What condition is GARFLD-FRMGTN/1300 over South Fork Pine Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does GARFLD-FRMGTN/1300 over South Fork Pine Creek carry?
About 228 vehicles per day (2021 count), of which roughly 25% are trucks.
How long is GARFLD-FRMGTN/1300 over South Fork Pine Creek?
The structure is 28 ft (8.5 m) long with a longest span of 26 ft (7.9 m) and a deck 28 ft wide.
Who owns GARFLD-FRMGTN/1300 over South Fork Pine Creek?
It is owned by the County Highway Agency.