Mosquito Lk RD over Canyon CR
FairWhatcom County, Washington · 00.1 S E Canyon Lk. · Structure no. 084762000000000
- Built
- 1937
- 88 years old, rebuilt 1958
- Condition
- Fair
- inspected February 2023
- Type
- Slab
- Concrete
- Length
- 80 ft
- 3 main spans
- Daily traffic
- 418
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Mosquito Lk RD over Canyon CR is a concrete slab carrying Mosquito Lk RD over Canyon CR in Whatcom County, Washington. It was built in 1937 and reconstructed in 1958, so it is 88 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 418 vehicles a day, roughly 16% of them trucks, projected to reach 1,000 by 2045. The structure is 80 ft (24.4 m) long and 27 ft wide. If it were closed, the detour would be 23 mi (37 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mosquito Lk RD over Canyon CR built?
It was built in 1937, making it 88 years old in 2025. It was reconstructed in 1958.
What condition is Mosquito Lk RD over Canyon CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Mosquito Lk RD over Canyon CR carry?
About 418 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is Mosquito Lk RD over Canyon CR?
The structure is 80 ft (24.4 m) long with a longest span of 63 ft (19.2 m) and a deck 27 ft wide.
Who owns Mosquito Lk RD over Canyon CR?
It is owned by the County Highway Agency.