SR 20 over Half Br Sta 155
FairWhatcom County, Washington · 5.9 E Skagit CO · Structure no. 0006974A0000000
- Built
- 1900
- 125 years old, rebuilt 1962
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 63 ft
- 1 main span
- Daily traffic
- 1,696
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 20 over Half Br Sta 155 is a steel stringer/multi-beam or girder carrying SR 20 over Half Br Sta 155 in Whatcom County, Washington. It was built in 1900 and reconstructed in 1962, so it is 125 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,696 vehicles a day, roughly 7% of them trucks, projected to reach 2,442 by 2039. The structure is 63 ft (19.1 m) long and 20 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 20 over Half Br Sta 155 built?
It was built in 1900, making it 125 years old in 2025. It was reconstructed in 1962.
What condition is SR 20 over Half Br Sta 155 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does SR 20 over Half Br Sta 155 carry?
About 1,696 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is SR 20 over Half Br Sta 155?
The structure is 63 ft (19.1 m) long with a longest span of 58 ft (17.8 m) and a deck 20 ft wide.
Who owns SR 20 over Half Br Sta 155?
It is owned by the State Highway Agency.