US Bridges

Lamar RD over Winnett Canyon

Good

Walla Walla County, Washington · 02.79 E of SR 124 · Structure no. 089285000000000

Built
2022
3 years old
Condition
Good
inspected September 2024
Type
Tee Beam
Concrete
Length
88 ft
1 main span
Daily traffic
86
2024 count
Owner
County
County Highway Agency

About this bridge

Lamar RD over Winnett Canyon is a concrete tee beam carrying Lamar RD over Winnett Canyon in Walla Walla County, Washington. It was built in 2022, so it is 3 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 86 vehicles a day, roughly 5% of them trucks, projected to reach 155 by 2046. The structure is 88 ft (26.8 m) long and 35 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesLamar RD
CrossesWinnett Canyon
Location02.79 E of SR 124
RouteCounty Highway 42260
Coordinates46.29017, -118.53464
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.9 US tons
Inventory rating39.2 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckOther
Main spans1
Design loadHL 93
Structure length88 ft (26.8 m)
Longest span85 ft (25.9 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic86 (2024)
Projected traffic155 by 2046
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$3.5 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Lamar RD over Winnett Canyon built?

It was built in 2022, making it 3 years old in 2025.

What condition is Lamar RD over Winnett Canyon in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Lamar RD over Winnett Canyon carry?

About 86 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Lamar RD over Winnett Canyon?

The structure is 88 ft (26.8 m) long with a longest span of 85 ft (25.9 m) and a deck 35 ft wide.

Who owns Lamar RD over Winnett Canyon?

It is owned by the County Highway Agency.