US Bridges

Henderson Blvd over Deschutes River

Fair

Thurston County, Washington · 0.55 Mile S Yelm HWY · Structure no. 079703000000000

Built
1961
64 years old
Condition
Fair
inspected September 2023
Type
Box Beam or Girders - Single or Spread
Concrete Continuous
Length
143 ft
3 main spans
Daily traffic
13,945
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Henderson Blvd over Deschutes River is a concrete continuous box beam or girders - single or spread carrying Henderson Blvd over Deschutes River in Thurston County, Washington. It was built in 1961, so it is 64 years old, older than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 13,945 vehicles a day, roughly 3% of them trucks, projected to reach 25,186 by 2038. The structure is 143 ft (43.6 m) long and 26 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesHenderson Blvd
CrossesDeschutes River
Location0.55 Mile S Yelm HWY
RouteCity Street 12120
Coordinates46.99503, -122.88102
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68 US tons
Inventory rating40 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length143 ft (43.6 m)
Longest span80 ft (24.4 m)
Deck width26 ft (8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,945 (2018)
Projected traffic25,186 by 2038
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$2.9 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Henderson Blvd over Deschutes River built?

It was built in 1961, making it 64 years old in 2025.

What condition is Henderson Blvd over Deschutes River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Henderson Blvd over Deschutes River carry?

About 13,945 vehicles per day (2018 count), of which roughly 3% are trucks.

How long is Henderson Blvd over Deschutes River?

The structure is 143 ft (43.6 m) long with a longest span of 80 ft (24.4 m) and a deck 26 ft wide.

Who owns Henderson Blvd over Deschutes River?

It is owned by the City or Municipal Highway Agency.