South Fork Mill CR over South Fork Mill Creek
GoodStevens County, Washington · 2.31 E JCT Aladdin Rd. · Structure no. 089164000000000
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 70 ft
- 1 main span
- Daily traffic
- 80
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
South Fork Mill CR over South Fork Mill Creek is a steel stringer/multi-beam or girder carrying South Fork Mill CR over South Fork Mill Creek in Stevens County, Washington. It was built in 2020, so it is 5 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 80 vehicles a day, roughly 41% of them trucks, projected to reach 75 by 2040. The structure is 70 ft (21.3 m) long and 17 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was South Fork Mill CR over South Fork Mill Creek built?
It was built in 2020, making it 5 years old in 2025.
What condition is South Fork Mill CR over South Fork Mill Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does South Fork Mill CR over South Fork Mill Creek carry?
About 80 vehicles per day (2024 count), of which roughly 41% are trucks.
How long is South Fork Mill CR over South Fork Mill Creek?
The structure is 70 ft (21.3 m) long with a longest span of 69 ft (21 m) and a deck 17 ft wide.
Who owns South Fork Mill CR over South Fork Mill Creek?
It is owned by the County Highway Agency.