Poor

Stevens County, Washington · 0.01 S Main Ave · Structure no. 085212000000000

Built
1935
90 years old, rebuilt 1945
Condition
Poor
inspected September 2024
Type
Culvert
Concrete
Length
24 ft
1 main span
Daily traffic
100
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Second Ave over Chewelah Creek is a concrete culvert carrying Second Ave over Chewelah Creek in Stevens County, Washington. It was built in 1935 and reconstructed in 1945, so it is 90 years old, older than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 2 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 100 vehicles a day, roughly 5% of them trucks, projected to reach 150 by 2040. The structure is 24 ft (7.3 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSecond Ave
CrossesChewelah Creek
Location0.01 S Main Ave
RouteCity Street 105
Coordinates48.27596, -117.71779
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert2 CriticalAdvanced deterioration of primary structural elements. Bridge may be closed until corrective action is taken.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourScour critical; extensive scour has occurred
Structural evaluation2: Basically intolerable, requiring high priority of replacement
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating17.2 US tons
Inventory rating13.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1 (+1 approach)
Design loadH 20
Structure length24 ft (7.3 m)
Longest span8 ft (2.4 m)
Deck width30 ft (9.1 m)
Roadway width29 ft (8.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2019)
Projected traffic150 by 2040
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$365,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Second Ave over Chewelah Creek built?

It was built in 1935, making it 90 years old in 2025. It was reconstructed in 1945.

What condition is Second Ave over Chewelah Creek in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2024.

How much traffic does Second Ave over Chewelah Creek carry?

About 100 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is Second Ave over Chewelah Creek?

The structure is 24 ft (7.3 m) long with a longest span of 8 ft (2.4 m) and a deck 30 ft wide.

Who owns Second Ave over Chewelah Creek?

It is owned by the City or Municipal Highway Agency.